Overheads: The Different Types Of Absorption Methods.
There are many ways to absorb overheads which are as follows:
|
DIRECT MATERIAL COST PERCENTAGE |
|
Suitable in situations where:
Unsuitable when:
|
|
DIRECT LABOUR COST PERCENTAGE |
|
Suitable in situations where:
Need to be careful to charge overheads with higher labour costs in the event of different level of skill. |
|
PRIME COST PERCENTAGE |
|
Prime cost consist of direct material and direct labour. Not a good absorption method as it has little relationship with overheads. |
|
DIRECT LABOUR HOUR RATE |
|
Suitable in labour intensive industry or where certain departments is still using manual means. Uses time as a basis.
Disadvantages:
|
|
MACHINE HOUR RATE |
|
Is suitable when the business is of capital intensive in nature or production being carried out by machines.
Disadvantage:
|
|
COST UNIT RATE |
|
Suitable where cost units passing through a cost centre are homogenous.
Applies in standard costing or budgetary control systems.
Cost Unit Rate method is very simple and a more direct mean. |